SAIFUL ISLAM.

Asst. Manager · Industrial Engineering

Saiful
Islam

I turn complex garment and textile operations into lean, data-driven systems that produce more with less waste.

Saiful Islam, Asst. Manager Industrial Engineering in Bangladesh
RoleAsst. Manager, IE
EmployerUrmi Group
CertifiedLSS Black Belt
Based inDhaka, BD
5+
Years in garments & textiles
18 lakh
Taka saved per month via automation
~48
Manpower freed in cutting section
~15%
Productivity gain from flow redesign

01 · Method

A process that finds waste first

Every project follows the same disciplined flow, so improvements are measured, standardized, and sustained.

Step 1
Map
Value stream and flow
Step 2
Measure
GSD and workload data
Step 3
Analyse
Bottlenecks and losses
Step 4
Improve
Lean and automation
Step 5
Sustain
5S, Kanban, control

02 · Results

Project sheets

Automation
Automation & Innovation Program
  • Impact on about 0.48% of total produced minutes
  • Saved an average of 18 lakh taka per month
  • Auto-hemming, labels, and elastic rings
SHT-01Urmi Group · Ongoing
Process redesign
Raw Material Receipt to Fabric Dyeing
  • About 20% more storage capacity
  • About 15% higher productivity
  • DMAIC and VSM based
SHT-02Jul–Aug 2025
Capacity design
Garments Cutting Section
  • About 48 fewer people required
  • Less overproduction and excess inventory
SHT-03Oct–Nov 2025
Finishing
Textile Finishing Floor Analysis
  • Dyeing-finishing capacity up 10%
  • Stenter machine downtime down about 15%
SHT-04Apr–May 2026
Value stream mapping
FTML Input System
  • 30% more usable space
  • Around 8 fewer manpower from excess-process removal
SHT-05Jun–Jul 2026
Lean practice
Introduction & Execution of 5S
  • Structured 5S across production areas
  • Better safety, discipline, and efficiency
SHT-06Urmi Group · Ongoing

03 · Experience

Career timeline

May 2024 – Present

Asst. Manager, Industrial Engineering · Urmi Group

Industry 4.0 automation, lean cost reduction, Kanban, and data flow to top management.

Apr 2023 – May 2024

Senior Executive, IE · HaMeem Group

GSD-based process analysis, central cutting follow-up, and cut-to-ship flow.

Nov 2020 – Apr 2023

Executive, IE · Sterling Denims Ltd.

Layout start-up team, line balancing, operation breakdowns, and bottleneck removal.

Lean Six Sigma Black Belt

BusinessBee, 2024. DMAIC project to bring reject and rework below 1%, plus a DFSS project.

B.Sc. Textile Engineering

National Institute of Textile Engineering and Research (NITER), 2017–2020.

Toolkit

GSD, line balancing, VSM, Kanban, 5S, Advanced Excel, Power BI. English C1.

Contact

Let’s make your factory leaner.

official@saifullah.com.bd · +880 1719 765431

Message on WhatsApp